David Finnie
Research outputs 23
Conference Contribution - Other 1
-
(2023) Subcontractor engagement in the Two-stage Early Contractor Involvement Procurement. AUBEA2023 Conference 26-28 November.
https://www.youtube.com/watch?v=NAz7J9Lv4QIhttps://www.aubea.ac.nz/
With: Rehan Masood
Conference Contribution - Published Paper 11
-
(2023) Application of value management practices in New Zealand construction. PAQS congress, Kuala Lumpur, Malaysia, 25-26 September.
https://paqs2023.com/sub-theme-3/https://paqs2023.com/sub-theme-3/
-
(2023) Covid-19 lockdowns - effect on female worker well-being in New Zealand Construction professions. Abstract published in book of abstracts, EPPM2023 Conference, Auckland, Nov 29 - Dec 01.
https://www.eppm2023.ac.nz/_files/ugd/1b2bf5_32da8846b66741599531caba40e5548b.pdf
With: Nayani Landage
-
(2023) Ethics provisions within New Zealand professional codes of conduct, toward a construction-wide code of ethics. Abstract published in book of abstracts, EPPM2023 Conference, Auckland, Nov 29 - Dec 01.
https://www.eppm2023.ac.nz/_files/ugd/1b2bf5_32da8846b66741599531caba40e5548b.pdf
With: Nick Wilson
-
(2023) Practices for reducing embodied carbon (EC) emissions in New Zealand commercial construction. Published in book of Abstracts for EPPM2023 Conference, Auckland, Nov 29 - Dec 01.
https://www.eppm2023.ac.nz/_files/ugd/1b2bf5_32da8846b66741599531caba40e5548b.pdf
With: Rehan Masood
-
(2022) Embodied carbon reduction: insight into the maturity of the New Zealand construction industry. Pacific Association of Quantity Surveyors Congress, Singapore. Presented pre-recording of presentation.
-
(2022) Transparent and sustainable procurement through twostage
early contractor involvement (2S-ECI) – Industry
perceptions, Proceedings of IConBEE2022. -
(2021) Case study of two-stage early contractor involvement (2S-ECI) used for seismic upgrades at Queenstown airport New Zealand. Royal Institution of Surveyors Malaysia (RISM) International Research Conference, 27 March 2021
https://www.facebook.com/RISM-International-QS-Research-Conference-669309143525717/
-
(2019) Improving 2-stage early contractor involvement: lessons from New Zealand. Paper presented at the 22nd Pacific Association of Quantity Surveyors Congress, Kuching Sarawak, Malaysia, 23 - 27 August 2019.
https://www.paqs2019.com/sites/default/files/2018-08/All_Abstracts.pdf
-
(2016) Adjudication and arbitration and the associated barriers to litigation. 20th Pacific Association of Quantity Surveyors Congress.
-
(2014) A student project development for multidisciplinary programs at Otago Polytechnic, 2014 Annual Conference of the Australasian Association for Engineering Education (AAEE2014), Wellington, New Zealand.
-
(2014) A student project development for multidisciplinary programs at Otago Polytechnic. 2014 Annual Conference of the Australasian Association for Engineering Education (AAEE2014), Wellington, New Zealand.
Journal Article 8
-
(2024) Embodied Carbon in New Zealand Commercial Construction.
With: Rehan Masood
-
(2024) Subcontractor Engagement in the Two-Stage Early Contractor Involvement Paradigm for Commercial Construction Knowledge by MDPI.
DOI: https://doi.org/10.3390/knowledge4020017 https://www.mdpi.com/2673-9585/4/2/17
With: Rehan Masood
-
(2021) Early contractor involvement: a review of pre-construction service agreements. https://www.icevirtuallibrary.com/doi/full/10.1680/jmapl.20.00038
-
(2019) Design development post contract signing in New Zealand: client’s or contractor’s cost? Proceedings of the Institution of Civil Engineers – Management, Procurement and Law,
https://doi.org/10.1680/jmapl.18.00044. -
(2018) Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
ISSN 1751-4304 | E-ISSN 1751-4312 -
(2015) The New Zealand Construction Contracts Amendment Act 2015 - For Better or Worse? Construction Economics and Building, [S.l.], v. 15, n. 4, p. 95-105, November 2015. ISSN 2204-9029.
-
(2013) Comparison of Time Adjustment Clauses between DZ3910, AS4000 and STCC. Australasian Journal of Construction Economics and Building, 13(1), 66-84.
-
(2012) Contract delay: what is it and how are we performing? Construction Economics and Building, [S.l.], v. 12, n. 1, p. 83-91, February 2012. ISSN 2204-9029.
Other 2
-
(2015) What's it really worth? NZ Construction News (21) April-May, 2015
-
(2014) Effective planning to improve productivity and reduce rework. NZ Construction News Aug-Sept, 2014
Thesis – Masters/Doctoral 1
-
(2015) Clarifying buildability obligations in construction contracts . Masters of Construction with Distinction, Massey University.